Friday, May 15, 2009

VOL FOLLOW UP 11 - FROM 19th TO 20th MARCH 09
LEARNING LOG WEEK 5 – 8 (21st April 09 – 15th May 09)

Coaching Plan
1) Familiarized myself with the coaching technique especially on the Dos and Don’ts by reading through the course handout and notes
2) Acquire skills
3) Identify coachee and establish schedule
Coachee : Puan Norhayati bte Husin (my secretary)
Coaching session no. 1 – 04 May 09
Coaching session no. 2 – 06 May 09
Coaching session no. 3 – 15 May 09
4) Implement coaching activities and keeping record of feedbacks
-Engagement and agreement to indulge in coaching exercise
-Identify issues to be coached
-Create insight
-Setting goal
5) Keeping records of each activities include feedbacks
6) Follow up on the progress of achieving the goal
7) Revisit and implement back-up plan if necessary (corrective measure)
8) Reassess the effectiveness

Coaching Session no.1

The first coaching session held on 4 May 09 and it took approximately 25 minutes. Initially I explained to her about the coaching technique, the purpose and its benefits. From the explanation she realized that it was not a fault finding session but more of opportunity to identify her inner strength and able to put her ideas into practice. In principle, she has agreed to be coached. In order to identify the areas to be coached, I have requested her to understand her roles and responsibilities, to list them down and to be presented in the next coaching session.

Coaching session no.2

The second coaching session held on 6 may 09 and it took approximately 45 minutes.
During this session she was very cooperative and always shows a positive attitude. We went through her roles and responsibilities and managed to identify an area that she needs to be coached and the area is:

Processing and distributing outgoing letters

Currently, as per my requirement, all letters have to be processed and distributed on the same day the letter being signed by the Project Director. She highlighted that it will be a problem if the letter is signed and passed to her for processing after 4 pm because according to the dispatcher, very often when he arrived at the addressee office, no one was there to receive the letters. In the end he has to acknowledge received the letter on behalf of the addressee himself and just leave the letters on the front table. The dispatcher worries if the letter could be missing.

Her proposals are:
a. Any letters that she received after 4 pm will be processed on the same day but to be dispatched on the next morning.
b. She will make arrangement with the dispatcher that the last delivery for that day will be processed and made ready for the dispatcher by 4 pm. As such she will make sure that she received the letters from the Project Director Secretary by 3.30 pm for processing.
c. She will make it her daily routine task to call the Project Director Secretary at 3 pm to check for any letters that have been signed and ready for processing.

In principle, we have agreed to the proposed arrangement and willing to
Proceed with the implementation immediately. The set goal is to make the
distribution of outgoing letters processes to be more effective and efficient.

Coaching session no. 3

The third coaching session held on 15 May 09 and took only 15 minutes. During this time, the questionnaires were focused on the status of the implementation, the effectiveness and the feedback from all parties involved. She reported that everybody has participated fully in the new process flow and has been successfully executed so far. Apparently, the new process flow has benefited all parties since it has created a specific timeline which has made planning for other activities more real.

Monday, April 20, 2009

VOICE OF LEADERSHIP (FU) 11 - 19 TO 20 MAR 09

VOL FOLLOW UP 11 - FROM 19th TO 20th MARCH 09
LEARNING LOG WEEK 1 – 4 (23rd March – 20th April 09)

Initially, right after completing the course on coaching, I planned to exercise the coaching techniques and skills that I have acquired, with my Secretary as the coachee, immediately after I got back to the office. But I decided to postpone it since I felt that I need to familiarize myself with the required information and formulate the strategy or steps by going through the course materials and notes again. The coaching course that I have attended is actually an eye opener for me. It enlightens me the true meaning of coaching and its purposes. By definition, coaching may seem like very simple activity but in practical it requires not only commitment but also high self discipline and full understanding of the coaching technique since the principle and the method are contradict with the style that I have normally practiced. I have learned from the course that the current technique that I am practicing when “coaching” my staff is actually defined as supervising. My understanding of coaching definition gathered from my reading of the course materials and notes are as follows:
· Offers a vehicle for insights and action that ultimately enables the coachee to achieve success in one or more areas of their lives.
· Helping others to help themselves and has power to transform people for the better.
· Helping people improve themselves through their own realization, self-learning and self motivation. All ownership remains with the coachee

I have learned that the main differences between coaching and supervising activities are that the coach needs to listen more rather than giving opinions or answers to the problem and the coach also needs to ask strategic questions in such a way allowing the coachee to find the solutions by him/herself. As such, the crucial actions that require my full attention now are to develop my listening skill and at the same time learn to restrict myself from giving out answers and instructions during any coaching session. Furthermore, I also need to differentiate between open and leading question and at the same time be able to change or rephrase the leading question into an open question.

On the other aspects, coaching activities could only happen when both party have come to an agreement for the coaching session to take place and must be based on trust. In establishing the rapport and trust, the coach must make clear the main objective of the coaching proposal to the coachee. It has to be explained in such a way that the intention is nothing but to find out the inner capability or hidden talent of the coachee and should focus more on the positive impacts or the benefit that the coachee will receive instead of only on the company. By doing so, it will create more openness and insight of the coachee. In creating insight of the coachee, it has to go through a process of asking questions, listening to the highlights, getting clarification, moving forward of the issue and repeating the process again in sequence. It is also very important to promote sense of responsibilities of the subject matter in the coachee.

During the coaching session, it is very important that goals must be set and the methods and timelines in achieving the goals must be established. The goal setting guidelines as briefed during the course is defined as “SMART” which could be elaborated as follows:


S - Specific (the goal must be clearly defined and well understood by the coach and the
coachee)
M - Measurable (it has to be measurable for easy monitoring)
A - Attainable (it has to be achievable)
R - Realistic
T - Timebound (must be over a specific and agreed timeline so that the achievement
could be minitored and reviewed)

It is also vital that the coach needs to stay neutral at all times. The coach must not show his authority and must level down his position. He has to act as the mediator in exploring the inner capabilities of the coachee and doesn’t have to be the expert on the subject matter. This may portray the sincerity of the coach and as a result create openness and trust in the coachee.

Prior to undertaking any coaching session, it is very important that one to consider the right moment and situation especially with regard to the moods and attitudes of the coachee. The moods and attitudes are the main factors in determining the success or the result of any coaching session as these factors may control the response and openness of the coachee, either being high on opposition level and low on acceptance level or the other way around.

Wednesday, January 21, 2009

LEARNING LOG FOR LEADING ORGANIZATIONAL CHANGE (LOC-12)

LEADING ORGANIZATIONAL CHANGE (LOC)
Learning Log

The word ‘Change’ can be defined as doing or making things differently than normally done, but the causes or reasons that could lead to the change could be variably differs. At one instance, someone needs to really understand and be convinced with the cause for the change before the change process commences. But, there are also instances where people simply change without any specific reason. For example, there are people stop the habit of smoking due to ill health or financial reason. But there are also people simply quit smoking just because they don’t feel like doing it anymore. Normally, it happens at every beginning of the year as a new resolution. However, this type of change normally won’t last long simply because the drive to sustain the change is normally low which is in line with the initial drive for the change. As such, getting full understanding of the cause or reason for the change is a crucial part of the change process.

The possible causes or reasons for change that a company could experience are described as follows:
1) Works demand - A change in the workforce in relation to the size and time input could be resulted from the increase or decrease in the capacity of job requirements. However, in response to the increase of work force requirement, multitasking system is adopted in most of the time.
2) Compliance to works requirements and responsibilities – A change in the process flow or system improvement due to its ineffectiveness or/and in response to the deficiency of the workforce.
3) Leadership change – Different leader may have different ways of doing things, different concept and different level of focus.
4) Financial constraint – Introduction of cost saving exercise may lead to the change in the modus operandi of the company. For example, the exercise to reduce the consumption of paper by switching the mode of distributing letters from through hardcopy to electronic copy. This may involve with minor modification of the existing system or an introduction to a totally new system. This exercise is considered as long term cost saving exercise since it may require additional spending during the upgrading or establishment stage of the system which may include the cost for providing the necessary training to the staff. The system requires the intended recipients to access the system in order to read and act on the letters.
5) Environment change such as shifting office – Normally it involves with emotion, style and perception changes such as the dress code, eagerness for the work and feeling or likeliness to be at work
6) New Year’s resolution – Normally the changes will be made based on the previous year’s achievement and performance, which the focus will be on improving the performance with the introduction of new objectives and target.
7) Change due to no specific reason – This could be due to feeling bored with the current situation or activities which normally happen during transition moment or era such as anniversary and New Year.

Prior to fully understand the reason for the change, it will be difficult to visualize the positive future vision or the benefit resulted from the change. And, if it is not being established correctly, the process of formulating and creating the change will be difficult. As a result, the change process will face with high level of resistance, low level of adaptability and potential failure.

The determination of the level of resistance and adaptability towards change could have a strong relation with the basis of the purpose for the change. Normally, the response will be positive if the purpose is based on the current deficiency of the workforce capability, the process flow and the system which definitely needing immediate improvement. However, if it is based on the purpose of just for the sake of making improvement, there is a high possibility that the response will be negative mainly due to the staff or organization is being complacent with the current situation especially when the subject is already in place for a long period. The most famous statement will be “why change? The current procedure or performance is still intact and effective”. In this case, an effective way of visualizing the better future could play a big role in shifting the response to positive.

As what I can remember, based on 19 years of service with the company that I am working with now, a lot of changes have been made and almost all of the changes were classified as “Development Change” type. One of the changes that had created a lot of grievances and high level of resistance from the staff is the introduction of Deltek timesheet system. Previously the timesheet was filled up and submitted through hard copy form and the procedure had already been in the system for quite a very long period. With the introduction of the Deltek System, everything has to be done on line via the computer system. Most of the staff was thinking that the HR Dept was transferring its work to them. Actually during this time, the staff could not see or visualize the better future from the change and they have become complacent with the existing procedure. The change process was not done properly. The staff was not being briefed of the reason for the change and also of the benefit from the change. In terms of the level of adaptability, it was quite low since none of the staff has ever experience it before and the System was not really user friendly especially for the non technical staff. What made the scenario became worse was during that time, not all staff were being provided with a computer. Computers were only provided to the Heads of Dept and high rank staff whereas, as for the low rank staff, it was on sharing basis. It was obvious that less focus was made during analyzing the existing system capability and also the impact towards the organization structure. Somehow, that change has led to another change which is very beneficial to the staff. It has become a policy now that each staff will be provided with one computer and through the system the staff will be able analyze their time input especially if they are serving more than one project.
I foresee that there are more changes will be made in the future which is in line with the UEM group ambition which calls for Continual Improvements. As such, it is highly importance that the Change Leaders be equipped with the correct tools and attitude as to ensure the effectiveness of the change process and the desired outcomes are achievable.

Wednesday, July 23, 2008

Learning log for week no 4 - 6 (30 June - 20 July 08)

Cost saving exercise on the distribution of incoming letters

The recent Health, Safety and Environment (HSE) walk about inspection has highlighted on the issue of improper way and unsuitable place of keeping hard cover files. It was found at the filing rack that files were placed horizontally on a row of vertically stacked files. There were also files found being kept underneath the table. This situation may create unsafe and uncomfortable condition towards the staff. The main reason that has caused the highlighted issue is the insufficient of filing rack and no more empty space available to place a new filing rack. One way to resolve this issue is to archive the document that are in the files and send them to the store at Head Office. However, I would consider this as a temporary measure only because as time past by and if the same activity was to be taken every time the filing racks are full, the store will also be full sooner or later.

In view of the current scenario, I have proposed to the management to implement paperless distribution of incoming letters only, which is via electronic copy, for a start. The department that is responsible for the distribution of all incoming letters is the Document Control Department (DC). A brain storming session was held among a newly formed small committee members which include the document controller, and the outcomes from the session are tabled as follows:

OBJECTIVE
To reduce the usage of paper copy during the distribution of incoming letters for the purpose of reducing the needs for hard cover files, additional filing racks and ultimately new storage area.

CURRENT STRATEGY OR PRACTICE
-All incoming letters either through dispatch or fax will be sent to DC for acknowledgement of receipt (chop received date and time) and numbering process.

-DC will then write down the names of the recipients on the cover letter. The normal recipients are the Project Director, respective Head of Departments and the carbon copied (cc) recipients. The letter will then be photostated according to the intended recipients and distributed to them. DC will keep the original letter. If the letter has an attachment, only the actionee (one of the recipients) will receive the original copy of the attachment while DC will keep a photostate copy.

-The letter together with the attachment (if any) will be scanned and the soft copy will be filed inside Electronic Document Management System (EDMS) while the hard copy will be filed inside the normal hard cover file.

PROPOSE CHANGES IN STRATEGY OR PRACTICE
-The changes start from the photostating process. DC will only require to photostate the letter and the attachment (if any) for the actionee and then continue immediately with the scanning process. Upon completing the scanning process, the letter could be distributed to the actionee. While DC is filing the scanned copy of the letter inside EDMS, he could also copy the letter electronically to the other recipients through dedicated folders in the system server. The recipients need to retrieve and read the letter from the dedicated folders in the system server through their personal computer and file them immediately in their own folders as required or sent the letter to another intended actionee(s) through e-mail. These folders could be archived and copied into CD

BENEFIT FROM THE PROPOSED CHANGES
-Reduction on the paper usage
-Reduction on photosting cost, toner of the photostate machine and electricity.
-Less time consumed by DC staff on photostating and by admin staff on distributing the letters. So, these staff could be more productive.
-The EDMS is being updated immediately.
-Less hard cover file needed
-Requirement to purchase new filing rack could be reduced or eliminated
-Requirement to acquire new storage area will be deferred.

CONCLUSION
The outcomes of the brainstorming session were presented to the Management and in principle, the Management has agreed with the proposal and requested for a proper Procedures or Guidelines be prepared for official approval since it involves with changes towards the ISO 9001 Quality Management System of DC. The established and approved new procedures will then be briefed to all staff for implementation purposes. Upon the completion of this task, the small committee was requested to look into the possibilities of establishing the same for outgoing letters. However, the process of changing it will not be straight forward as for the incoming letters since the process owner is not the DC but the respective Department who is issuing the letters.

Tuesday, July 8, 2008

Learning Log Week 3 (23 - 29 June 08)

A Winning Business Strategy
The important key points that I have gathered from my pre-reading materials or BSL Module are as summarized as follows :

There are two main approaches in developing Winning Business Strategy and they are
1) Offensive approach and
2) Defensive approach

Three Generic Strategies as suggested by Michael Porter those to be adapted into various industries are
1) Overall Cost Leadership – Low Cost Position
2) Differentiation – Uniqueness Perceived by Customers
3) Focus – concentrate on particular group/product line or market

A book entitled “The Discipline of Market Leaders” by Michael Treacy and Fred Wiersema listed down almost the same generic strategies as Porter’s but it requires a company to focus and excel in only one discipline while maintaining the other two disciplines at an acceptable level. Somehow, the situation may allow competitors to take full advantage on the unfocussed disciplines and out maneuvered them. The three disciplines are Operational Excellence, Product Leadership and Customer Intimacy.

Patterns of Winning Companies
1) From Zero to Hero
Normally a Market leader, Offensive, Pioneer, profit above average, large competitive market and building strong customer franchise.
2) Sustained Leadership
Holding on under threat, Defensive, Maintainer, profit above average with large competitive market.
3) Profit Exception
Sustain Profit while the others cannot, Decent to good market position with a large competitive market.

“Strategic position” must be able to be traded-off when the activities are incompatible in order to sustain it.

A company must define its key choices on WHAT it needs to be Operationally Excellent.

Value Proposition is the act of improving the perceived value by either increasing the perceived benefit or reducing the perceived cost of the intended customer.

Value Innovation is a process of introducing new elements or rearrangement of elements in the Customer Value Proposition.

Blue Ocean Strategy – Competing where no one is or make your competitor irrelevant.
There are 4 actions tool used in developing the strategies which comprise of the following :
1) Reducing unimportant factors to well below industry’s standard
2) Creating factors that has never been offered by the industry
3) Raising crucial factors to well above industry’s standard
4) Eliminate unwanted factors

Disruptive Innovation is a process where the cost and the quality are being reduced relatively in a head to head battle between competitors.

Red Ocean Strategy – Competing where others are.

When developing a Winning Strategy Model, one must define the following:
1) Battlefield – Type of industry
2) Customer target
3) Product/Service Mix
Then outline the following:
1) Differentiated Value Proposition
2) Sustainable Performance Model
3) Relevant Competitive Asymmetry
4) Key Choices and
5) Defined Value

Winning Positioning can be explained as the perception level or the understanding of the customers and competitors towards the company’s product or services in relation to the significant differences that has successfully captured their attention. According to a research on purchase behavior, Positioning is the core in purchasing decision making process.

Monday, June 23, 2008

LEARNING LOG FOR WEEK NO 2 (16 - 22 JUNE 08)

ESTABLISHING COST SAVING GUIDELINES ON FUEL CONSUMPTION

As an introduction, I am attached to Opus-NMM which is one of the project team for Opus International (M) Bhd. who is responsible for the Network Maintenance Management for 3 major highway Concessionaires in Malaysia namely PLUS, ELITE and LINKEDUA. There are 3 main Divisions in Opus-NMM and they are Technical Div., Construction Contract Management Div. and Operations Div. I am the Head of the Operations Div. and the two main tasks of the Operations Div. are to carry out assets periodical inspections and to manage Work Orders implementation for assets repair or rehabilitation works. The term assets refer to slopes, drainage, bridges and pavement existed within the highway boundaries. In order to execute these tasks, the Operations Div. staff requires traveling along the highways almost everyday. With such activities, the recent increase of fuel price has a huge impact on the operational expenses based on the allocated budget. Initially, I explained to my key staff of the current situation and expressed to them on the important of establishing Cost Saving Guidelines for immediate implementation. A brainstorming session was held with the key staff and the issues and proposed action plans that have been highlighted, discussed and agreed upon during the session could be narrated as follows:

Issue
Government decision to increase petrol price by 40%

Impact
Operational activities and budget

Objective
To formulate strategic plan on how to optimize the fuel consumption by establishing Cost Saving Guidelines.

Assessment on current strategy
-There are no documented guidelines have been established.
-Highlight on the needs for cost saving was only made on very general ways and
no clear directions were conveyed to the staff.
-Insufficient monitoring and awareness

Proposed changes on the strategy
-To establish the guidelines with detailed action plans and document it for easy
reference and ease up monitoring process.
-To brief staff and provide awareness on regular basis.
-To monitor closely the implementation of the action plans.

The action plans
The action plans are established based on two main factors that could have direct relation with fuel consumption effectiveness and they are human and vehicle factors.
1) Action plans based on human factor
- To drive according to speed limit or less since the fuel consumption will be very much lesser if compare to driving at above 120km/hr. Besides saving on fuel consumption, it is also a preventive measure from getting speeding summon.
- To gather information and properly plan on the activities and locations to be visited as this will eliminate unnecessary traveling which could resulted in additional fuel consumption and time spent.
- To control the pattern of movement while traveling from the office to the intended destiny and it must be of “a loop”. To avoid from creating loops within the loop due to the adoption of “multiple back and forward” movements.
- To gradually increase the speed and not to ramp up the speed abruptly during initial driving as this would have an impact on the fuel consumption and the engine durability.

2) Action plans based on vehicle factor
- To service the vehicle according to the manufacturer guidelines. For example, change the engine oil and the filter; service the air condition and breaking systems according to the recommended mileage or timelines. The purpose is to ensure the vehicle performs at its intended level.
- To always check the tire pressure since a car running on low tire pressure tends to consume more fuel.
- To ensure the exhaust pipe is in good condition since a vehicle with leaking exhaust pipe may affect the performance and tends to consume more fuel.

Monitoring tools
1) To table the guidelines and attached it together with the vehicle log book as an easy reference for the vehicle users.
2) To create a checklist to form part of the daily entry of information of the vehicle log book.
3) To ensure the vehicle administration staff to check the log book weekly and report on any non compliance.

Awareness on the established guidelines will be held immediately, the implementation status will be monitored regularly probably for a period of 3 month and the effectiveness will be reviewed for further adjustment or improvement deemed necessary.

Sunday, June 15, 2008

Learning Log for week 1 (9 - 15 June 08)

On the first week subsequent to attending the 3 days course (02 - 04 June 08) on Business Strategy Leadership , I took sometime to vet through the BSL module or the pre reading material that was sent to me a week before the course date. This is just to refresh my mind on the subjects that have been briefly presented and discussed in the 3 days course. At the same time, I have tried to relate all the information highlighted in the module with the current condition of the project that I am taking charge at the moment.
My understanding of the subject matter could be summarized as the followings:
· Business is about the creation and retention of customers which the activities must be carried out in a manner where the interest and well being of the shareholders, society and environment have to be given high consideration and must be within the legal and ethical limit.
· Business strategy could be defined as the method of achieving goals and objectives and supported by a set of requirements on action plans and resources allocation. while establishing a strategy, the conditions that need to be taken into account are the possible choices, level of control depending on the complexity of the situation, interdependency with competitor and execution capabilities. The set strategy must be in line with the purpose of strategy which is to "WIN".
· A winning strategy should be made as simple as it can be, but no simpler as allowed it to be copied. It also has to be changeable and adaptable to suit the present requirements or situations.
· Success is measured on Relative Performance in winning and retaining customers and not purely on absolute financial performance.
· Understanding the Mission, Vision, Objective and strategy/Tactic.
· Mission - Purpose and Scope
· Vision - Where or What to be (normally emotional and motivati0nal)
· Objective - What to achieve ( Strategic Intent)
· Strategy/Tactic - How to achive the set objective.
· Plan - Detailed steps to execute the strategy.
· Strategy Tools
1) SWOT
S - strengths, W - weaknesses, O - opportunities, T – threats
+ve - Creative, descriptive and qualitative rather than analytic, predictive and quantitative.
- Emphasize fit between internal and external.
-ve - Highly subjective, tends to reinforcing existing beliefs and often results in "within the box" thinking.
2) PIMS - Profit Impact of Market Strategy.

3) Strategic Thinking
a) Content - Belief about Agency (control) and Predictability (Ability to predict the future).
b) Process - Belief about strategic planning which involve in more analytical process, decomposed it in series of steps, emphasized the need for detailed plan and require specialized people (planner).

Traditional Strategic Planning Process for Business Unit
i) Set Mission and Objective.
ii) External Analysis (identify opportunities and threat).
Internal Analysis (identify strength and weaknesses).
iii) Matching process (strategy formulation).
iv) Action plan, budget and implementation.
v) Monitor, review and adjust (if necessary, return to process no 2).

4) Execution - Ability to execute strategy is more important than the quality of the strategy itself.
· In summary, a company performance could be determined or measured by 3 main elements such as:
1) Which industry you compete in.
2) How good your strategy is.
3) How well you execute your strategy