The word ‘Change’ can be defined as doing or making things differently than normally done, but the causes or reasons that could lead to the change could be variably differs. At one instance, someone needs to really understand and be convinced with the cause for the change before the change process commences. But, there are also instances where people simply change without any specific reason. For example, there are people stop the habit of smoking due to ill health or financial reason. But there are also people simply quit smoking just because they don’t feel like doing it anymore. Normally, it happens at every beginning of the year as a new resolution. However, this type of change normally won’t last long simply because the drive to sustain the change is normally low which is in line with the initial drive for the change. As such, getting full understanding of the cause or reason for the change is a crucial part of the change process.
The possible causes or reasons for change that a company could experience are described as follows:
1) Works demand - A change in the workforce in relation to the size and time input could be resulted from the increase or decrease in the capacity of job requirements. However, in response to the increase of work force requirement, multitasking system is adopted in most of the time.
2) Compliance to works requirements and responsibilities – A change in the process flow or system improvement due to its ineffectiveness or/and in response to the deficiency of the workforce.
3) Leadership change – Different leader may have different ways of doing things, different concept and different level of focus.
4) Financial constraint – Introduction of cost saving exercise may lead to the change in the modus operandi of the company. For example, the exercise to reduce the consumption of paper by switching the mode of distributing letters from through hardcopy to electronic copy. This may involve with minor modification of the existing system or an introduction to a totally new system. This exercise is considered as long term cost saving exercise since it may require additional spending during the upgrading or establishment stage of the system which may include the cost for providing the necessary training to the staff. The system requires the intended recipients to access the system in order to read and act on the letters.
5) Environment change such as shifting office – Normally it involves with emotion, style and perception changes such as the dress code, eagerness for the work and feeling or likeliness to be at work
6) New Year’s resolution – Normally the changes will be made based on the previous year’s achievement and performance, which the focus will be on improving the performance with the introduction of new objectives and target.
7) Change due to no specific reason – This could be due to feeling bored with the current situation or activities which normally happen during transition moment or era such as anniversary and New Year.
Prior to fully understand the reason for the change, it will be difficult to visualize the positive future vision or the benefit resulted from the change. And, if it is not being established correctly, the process of formulating and creating the change will be difficult. As a result, the change process will face with high level of resistance, low level of adaptability and potential failure.
The determination of the level of resistance and adaptability towards change could have a strong relation with the basis of the purpose for the change. Normally, the response will be positive if the purpose is based on the current deficiency of the workforce capability, the process flow and the system which definitely needing immediate improvement. However, if it is based on the purpose of just for the sake of making improvement, there is a high possibility that the response will be negative mainly due to the staff or organization is being complacent with the current situation especially when the subject is already in place for a long period. The most famous statement will be “why change? The current procedure or performance is still intact and effective”. In this case, an effective way of visualizing the better future could play a big role in shifting the response to positive.
As what I can remember, based on 19 years of service with the company that I am working with now, a lot of changes have been made and almost all of the changes were classified as “Development Change” type. One of the changes that had created a lot of grievances and high level of resistance from the staff is the introduction of Deltek timesheet system. Previously the timesheet was filled up and submitted through hard copy form and the procedure had already been in the system for quite a very long period. With the introduction of the Deltek System, everything has to be done on line via the computer system. Most of the staff was thinking that the HR Dept was transferring its work to them. Actually during this time, the staff could not see or visualize the better future from the change and they have become complacent with the existing procedure. The change process was not done properly. The staff was not being briefed of the reason for the change and also of the benefit from the change. In terms of the level of adaptability, it was quite low since none of the staff has ever experience it before and the System was not really user friendly especially for the non technical staff. What made the scenario became worse was during that time, not all staff were being provided with a computer. Computers were only provided to the Heads of Dept and high rank staff whereas, as for the low rank staff, it was on sharing basis. It was obvious that less focus was made during analyzing the existing system capability and also the impact towards the organization structure. Somehow, that change has led to another change which is very beneficial to the staff. It has become a policy now that each staff will be provided with one computer and through the system the staff will be able analyze their time input especially if they are serving more than one project.
I foresee that there are more changes will be made in the future which is in line with the UEM group ambition which calls for Continual Improvements. As such, it is highly importance that the Change Leaders be equipped with the correct tools and attitude as to ensure the effectiveness of the change process and the desired outcomes are achievable.